Infrastructure

coldforge2 (1)

infrastructure1

coldforge3 (1)

Infrastructure

50,000 sqft facility built in 2011, with the following equipment:

30+ CNC machines

5+ VMC machines

10+ Presses ranging from 100-1300 tons

Automated in-line annealing capabilities as well as pit furnaces for annealing

Zinc Iron plating capabilities

Complete QC lab, Fully automated CMM, Talyrond roundness tester

Complete tool room with EDM die-sinkers, Wire-cut EDM’s